The land where the present pitches are situated was acquired in 1960/61 and a gigantic earth-moving operation was required to produce the current two pitches on a split-level arrangement.
The building's east portion sits at a level between the first and second floors, resembling a split-level design, and houses metal, wood, and automotive shops.
The apartments are designed following a split-level planning system, which results in a ceiling height of 2.85 m over the living area and 2.7 m in the raised bedrooms.